A/C is 99% installed. Installed a new expansion valve and mounted the evaporator. Installed all the lines, condenser, dryer, mount, a/c compressor.
Just have to tighten the two large connectors, remove the "dead" button, and then charge the system.
Oh, and I forgot, I need to rewire the evaporator temp sensor. My car is a 93, so its wired for R12. The a/c system is R134, difference being is 2 Pin for R12 and 3 Pin for R134. No biggie though, I got the pigtail today too!
__________________